The Buckland Road project involved the proposed extension of an existing dropped kerb at a residential property located on a 90-degree bend. The road geometry created constrained visibility conditions, meaning the access could not be considered solely as a frontage alteration. A visibility assessment was required to demonstrate that vehicles leaving the property would have appropriate sightlines to approaching traffic and that pedestrians and other road users would remain suitably protected.

Civia was appointed to prepare the dropped kerb design and supporting visibility assessment for the resident. We surveyed the relevant section of Buckland Road, reviewed sightlines from the proposed access and considered stopping sight distance requirements in relation to the road environment. The resulting plan demonstrated the extent of the proposed dropped kerb and provided the technical evidence needed to support approval from the local highway authority, allowing the access to be improved while maintaining safe egress from the property.

Get in Touch

Inspired by this case study and want to learn how Civia can make your next project a success? Contact us today.

Salcombe Avenue, Stafford

Salcombe Avenue, Stafford

The Salcombe Avenue project involved a Stafford resident seeking an enlarged dropped kerb to improve access to their driveway and increase the usability of their property frontage. Although modest in scale, the design needed to respond to the resident’s parking requirements while meeting the technical and layout standards of the local highway authority. Clear definition of the proposed kerb extent and access arrangement was therefore required to support approval.

Civia was appointed to prepare the dropped kerb design and assist the resident through the approval process. We obtained an accurate base plan of the property and adjacent highway, discussed the client’s requirements for vehicle parking and prepared a compliant access layout for submission. Following approval, we continued to support the client with contractor appointment and construction queries, helping the scheme progress from initial design through to delivery.

Get in Touch

Inspired by this case study and want to learn how Civia can make your next project a success? Contact us today.

Birmingham Children’s Hospital

Birmingham Children’s Hospital

The work at Birmingham Children’s Hospital centred on managing vehicle movement within a highly constrained and sensitive setting, where space was limited, pedestrian activity was constant and emergency access had to remain uninterrupted. The project required the redesign of temporary arrangements on Steelhouse Lane, the organisation of overflow ambulance parking and a series of swept path assessments to ensure that ambulances, buses and service vehicles could move safely through a tight urban environment without affecting day-to-day hospital operations.

Civia’s approach combined early on-site assessment with iterative design; sketching and discussing proposals with the client and design team to co-ordinate the buildability and practicability of the proposals in conjunction with site constraints and other designers’ works. Detailed vehicle-tracking simulations were used to refine layouts, resolve conflict points and preserve emergency response capability. 

The final arrangements eased emergency access to the Hospital and achieved project goals, whilst sustaining uninterrupted access for emergency vehicles during the works and minimising impact on the surrounding traffic network.